Saturday, May 31, 2008

Yes, the Carpentary has arrived!

The carpenter have been doing up all the works and it is half done now... Consider quite fast coz itz oni 1 day work!
The area behind the main wooden door (we did this carpentary to cover up the circuit breaker box and the racks installed inside can be used as a key press or to hang some umbrellas. Still awaiting mirror...):

Home Shelther (Almost done too, except awaiting mirror and some part of carpentary still not up yet):

Kitchen Cabinet (Awiting granite top, hood and hob and the sink tap. The blum system still havent installed yet):



Common Toilet vanity cabinet:
Masterbedroom seatee (A request to my ID that i need drawers so as to put my towel, bedsheet etc in due to the small wardrobe we have in the masterbedroom. The extreme right side are slots used to put dvd player and maybe the scv box):
Masterbedroom 2 side tables:

Masterbedroom Wardrobe (Very small due to space constraint):

Masterbedroom Toilet Vanity Cupboard (With 2 sliding door and 2 drawers):

Will post more pics soon after the capentary is done! Hope to move in by 15june... =)

No comments: