Friday, May 9, 2008

Glass Work and Toilet Bowls installed...

1 major milestone... Glasswork juz installed!

MBR toilet glass door (shower screen not up yet):


Bedroom 3 glass fixed wall + sliding door (gng 2 ask Lisa to do a box-up):


Kitchen Sliding Door (From the inside): Ask the tiler to put in some homogeneous steps at the foyer:Toilet bowls and heater and rain shower installed! Here's the preview:

The Ariston 25L Water heater @ Common toilet:

Common Toilet Bowl:
MBR white toilet bowl! TOTO brand + expensive!!!:

Rain shower @ MBR toilet:

we were to inspect the lighting installation and they were nicely done by the contractor. However, there is a few hiccups such that they install the wrong lighting colour. (eg. warm light n white light) Oni 2 of them is affected and i ask Lisa to get it changed for me. So i told her b4 some other lighting colours got confused. From the pictures below, u can c that my lights model are more or less the same. Hehe.

Dining Area Light (Still have a pendant light not fixed yet):
Living Room Lights (Still have veneer beam lights not fixed yet): Service yard light: Kitchen Light:
Common Toilet Light:

Bedroom 2 light:

Bedroom 3 light:

Masterbedroom toilet lighting:
Masterbedroom wardrobe area lighting:
The aircon man did come and fix the aircon yesterday, n last min say he sick at abt 1pm. The installation was supposed to be at 3pm. So, a penalty of doubt, we arrange for him to install on next mon. He agreed and after another hour, he call backed agn and ask if he could install 2moro. Veri troublesome... Haiz. So in the end have to meet him 3pm 2dae agan...
More pictures to be updated!