Thursday, April 24, 2008

8th day of reno... 23rd Apr 2008...

Early in the morning, we went to check the progress again... Need to ensure the overlaying of toilet tiles are done before monday the aircon man can do the trunking and piping...


Common Toilet wet area tiles done:

Master bedroom toilet wall overlay half done. We choose a marble-like tile... They still need a few pieces more before the entire wall is done:


The thread for the fixed glass panel is done for bedroom 3:

The service yard washing machine and dryer base is up!

The kitchen wall tiles are done after the hollow wall is built up. Tiles 100% identical. Heng!