20th April 2007... Fridge base is ready!

5th day of reno... For the past few days, we have been going to take pics of our the reno progress at night! so all the pictures are quite blur... 2dae, we went early in the morning!
The hollow block wall for kitchen wall... (clearer view):


2day, the fridge base is up! However, the tiles is slightly different with those given by HDB... Luckily, it is used as a fridge base. So it cannot be visually noticed...
The cute fridge base! Noticed there is a small gap on the left of the fridge base... It is the allowance for my kitchen sliding door...:




The kitchen cabinet base done:





My ID paste the layout plan of the things that needs to be done as a reference for the contractor and paste it on the kitchen wall: